Sign In | Join Free | My infospaceinc.com
China KYE Mould Techenology Limited logo
KYE Mould Techenology Limited
KYE Mould Techenology Limited
Site Member

6 Years

Home > Die Casting Mould >

LED Headlinght A380 ADC12 S50C LKM Die Casting Mould

KYE Mould Techenology Limited
Contact Now

LED Headlinght A380 ADC12 S50C LKM Die Casting Mould

  • 1
  • 2
  • 3

Brand Name : KYE

Model Number : OEM

Certification : ISO9001:ISO14001

Place of Origin : China

MOQ : 1 set

Price : To Be Negotiation

Payment Terms : T/T

Supply Ability : 50 Sets Mould Per Month

Delivery Time : 30 working days

Packaging Details : Wooden Case With Steel Frame

Part Mateiral : A380/ADC12/A356/ADC12

Mold type : 2 plate-mold

Useage : LED Headlinght Aluminum Base

Mold material : 1.2344/H13/738H

Mold base material : S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base

Part surface : Polishing

Shaping mode : Die Casting

Material : Aluminum

Surface treatment : customized(polishing,painting,shot blasting

Contact Now

LED Headlinght A380 ADC12 S50C LKM Die Casting Mould

Product Details Description

Mould standard LKM
Mould type 2 plate-mould
Country of origin China(mainland),Guang Dong
Plate steel 1.2344 steel
Shaping Mode Die Casting
Runner type Cold runner
Gate type Edge-gate
Cycle time 30S
Design software CAD, UG, Proe
MOQ 1 set
Payment term T/T
Package Artificial Wooden Box with Steel Frame
Deliverly date 4-5 Weeks
Mould number According to customer requirement
Mould life 100,000 shots

LED Headlinght A380 ADC12 S50C LKM Die Casting Mould

Our Service

1. New project/design development assistance, base on customer’s samples or design drawing;

2. When the customer encounter bottleneck, give them some technical assistance;

3. Help the customer complete the 3D design drawing;

4. Simulate the effect of the product by simulation software and offer the simulation report;

5. Test Mold: Test Mold and Sample Making;
6. Delivery Mold: Delivery to Customer;

7. Product Making;

8. After service: After Sale Information Communication.

Brief introduction of service cooperation process
1. Customized Making

Per your drawings or samples, we can customize your mold.

Per your requirement, we can modify and design your parts structure to establish the overall 3D effect drawing. And per above 3D drawing, we can provide mold making quotation and product molding quotation to you to help you to do the entire costing analysis.

2. Mold development and processing

After the customer's rapid prototype or diagram file is confirmed, we enter the mold design and processing flow.
a. Material purchase: According to the estimated product quantity and product appearance structure and post-processing, select different mold materials and mold base. The quality of the products required by the customer with the least cost. No waste, high quality.
b. Mold processing: The company has advanced high-speed machining centers, wire cutting, precision spark machines, lathes, grinding machines, milling machines, drilling machines and other processing equipment. According to the product requirements, choose the appropriate processing method, and complete the assembly and test.


3. Mould test review

After trial of mold, according to mold test situation and test report and testing sample,we will discuss with customers to further verify product quality and requirements, and confirm samples.

4. Modification and improvement of the mold

According to the review report, improve the modification of the nuances of the mold. And re-testing and back-surface processing, etc., to achieve customer required quality and confirmation.

5. Injection Molding Processing

The company has a first-class injection molding machine, check the quality of the mold and adjust the appropriate process parameters, complete the product injection molding, inspection packaging. After removing the nozzle, the quality of the injection parts will be checked, the qualified semi-finished products will be packed, ready to transfer to the next process, and the unqualified products should be collected and recycled.


6. Surface treatment


7. Complete assembly


8. Delivery to customers.

FAQ:

Q: Which material will your factory use to make a mold?
A. Our regular material has NAK80, S136, LKM, DAIDO, HASCO, DME

Q. What's your delivery time for molds and plastic injection products?
A. Our delivery time for mold: 3-5 weeks as mold structure complexity.

Q: Are you trading company or manufacturer?
A: We are a tool manufacturer specialized in customized injection molds, mold components, plastic products for foreign markets.


Q: I have a sample but don’t have drawing, what can I do?
A: Please send us some photos of the sample. And you can send us a sample and tell us your idea ,we will help to finish the 3D drawing design

Q: Can you produce if I have a drawing?
A: Please send your drawing to our sales representative, then all the information will be forwarded to our engineer and they will evaluate it. A detailed proposal will be advised within 24 hours.

Q: Do you make customized products based on our design drawings?

A: Yes, we are a professional metal fabrication factory with an experienced engineering team to make custom products according to clients'drawings.

Q: Will my drawing be safe after you get it?

A: Yes, we will not release your design to third party unless with your permission. And we can sign the NDA before you send the drawing.


Product Tags:

S50C LKM Die Casting Mould

      

S50C LKM Mould

      

A380 ADC12 LKM Mold

      
Quality LED Headlinght A380 ADC12 S50C LKM Die Casting Mould for sale

LED Headlinght A380 ADC12 S50C LKM Die Casting Mould Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: KYE Mould Techenology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)